In the second half of 2022, we started setting up our own wind farm to test the generators that will be used in the production of electricity for self-sufficiency and all the key components of the wind farm.
The height of the column is 4m, the wings are 3m in diameter, and the height of the wings is 2.5m. All this will be sufficient for testing when the wind conditions are sufficient. The windmill is expected to start spinning when the wind is blowing at around 4m/s.
We are also developing our own control device to monitor and control key electronic parameters for self-supply electricity produced.